HUAWEI BTS 3606 PDF

HUAWEI BTS 3606 PDF

Mar 27, 2020 Education by admin

All the outdoor units including BTSAC and RRU comply with either With Huawei latest CDMA BTS products, based upon the physical. Widely deployed in Reliance’s network, Huawei’s BTS AC-R is designed to handle high temperatures and power failures in India. Find solutions to your huawei bts question. Get free help, tips & support from top experts on huawei bts related issues.

Author: Kajisho Dishura
Country: Montenegro
Language: English (Spanish)
Genre: Finance
Published (Last): 16 March 2005
Pages: 71
PDF File Size: 3.63 Mb
ePub File Size: 17.72 Mb
ISBN: 261-3-86671-323-3
Downloads: 88113
Price: Free* [*Free Regsitration Required]
Uploader: Sabar

Huawei BTS DBS BBU3900 LTE GSM TDSCDMA WCDMA CDMA2000 Base Station BBU RRU LBBP UBBP WBBP UPEU

Fasten the three bolt sets in the following order: Hardware quality control supervision. Feed back the situation to the local Huawei Representative Office.

Other Cables The power cable and the grounding cable are routed straight and bundled neatly. Muhammad Waleed menyenaraikan 6 pekerjaan pada profil mereka. Installation Method You need to prepare the U-bar support on the site. Munir has 2 jobs listed on their profile.

Connect the two probes to the paint-free place of the base and the expansion bolt. Mustapha has 4 jobs listed on their profile. If the outer package is damaged or soaked; or the equipment is soaked and becomes rusty, stop unpacking and find the cause. To remove cabinet doors, do it in a reverse order.

Nadun has 3 jobs listed on their profile. Lead the cables into their corresponding cable-fixing troughs. Huawei B Dupa ora 17 scade viteza medie DL pe la Normally, the fan box is installed upon delivery. Don’t have an account? EC21 in Korean Chinese.

  ARGOSTOLI MAP PDF

Uzual cand nu e aglomeratie un speedtest imi arata Mbps. It enables flexible coverage along railway lines, especially tunnels and bridges. The letters A, B, C as shown in Figure are not cable labels.

Am insa vedere directa la un BTS Paltinis km in linie dreapta, si ma gandeam ca daca as orienta o antena yagi in directia acelul BTS as avea o viteza mai buna. No field installation of the fan box is required. Reposnsible for Technical documentation and conducting PAT as well.

You may have to register before you can post: Installing Or Removing Side Doors 3. Patching E1s and monitoring the system.

Align the holes on the antistatic floor with the connecting holes of the support. View the PDF file for free. Mkhululi has 4 jobs listed on their profile. Make sure the support is level and then cross-fasten the bolts of the lower support to 45 N-m in-lb with a torque wrench.

Huawei makes it large in CDMA – Huawei Publications

Its low power consumption makes it possible to be powered by green energy — solar power, wind power, and biogas. If the digital power and amplifier power are normal, the antenna feeder may be connected abnormally.

Hassan has 3 jobs listed on their profile. Fungsi dari Base Transceiver Station adalah: Outline Figure shows the outline of A series support. Quick Information Brand Name: Leveling the lower support See section 2. Select and release the primary mouse button without Click moving huxwei pointer. Figure shows RF cable connections, indicated by blue lines.

  JAVA SMPP TUTORIAL PDF

Huawei cdma bts

Figure Installing a board 2 Tighten the screws clockwise on the front panel, as shown in Figure Free Member Registration Date: Installing the Lower Support To install the lower support, proceed as follows: Do not bend an optical fiber to a 366 angle upon distribution. Its advanced features include priority call, call hold, late entry, dynamic grouping, and fallback mode.

Mouse operation Action Description Press and hold the primary mouse button left mouse Select button by default. Arqum has 4 jobs listed on their profile. Replacing existing Indoor Rectifier with Power Cabinet. Remove four bolts and one gasket that connect the antistatic floor and the support. Vivek has 4 jobs listed on their profile. The following table shows the specifications of the BTS Table 2: There are cdma huawei 360 suppliers, mainly located in Asia.

Determine the installation 3660 for the DDF according huaeei the engineering design for the equipment room.

When handling the cabinet, hold on the solid places such as the upper cable rack or bone frame. Do not put the wooden case upside down. The name of the program executable file is trscd. Table of Contents Add to my manuals Add.